Placement of
Geotextile Fabric
|
Placement of Geotextile Fabric
|
 |
 |
|
8" of Crushed
Concrete for Base Material
|
Pavement Base
Prep
|
 |
 |
|
Concrete Removal Completed |
Base
Prep Work |
 |
 |
|
Footings for ILS
Localizer
|
One Pile Grows,
While The OtherGets Smaller
|
 |
 |
|
Crushing
Continues
|
Batch Plant Setup
|
 |
 |
|
Batch Plant Setup
|
Work
Continues on Arresting Barrier |
 |
 |
|
Base
Prep Work |
8"
of Crushed Concrete for Base Material
|
 |
 |
|
Placement of
Geotextile Fabric
|
8" of Crushed
Concrete for Base Material
|
 |
 |
|
Temporary Runway
18
|
Looking North
|
 |
 |
|
Southern Portion
of Project
|
Batch Plant
|
 |
 |
|
Runway 13 |
Runway 9/27 |
 |
 |
|
View Looking
South
|
Southern Portion
of Project
|
 |
 |
|
Looking North
|
West Side of
Airport
|
 |
 |
|
South end of
Project Area
|
Staging Area
|
 |
 |
|
Staging Area and
Terminal
|
Crushed Aggregate
Pile
|
 |
 |
|
Batch Plant
|
Batch Plant
Loading Trucks
|
 |
 |
|
Future Taxiway
'E'
|
Survey Crews Working |
 |
 |
|
Trimming Base Elevation |
Paving Econocrete
Base
|
 |
 |
|
Paving Econocrete Base
|
Applying Curing
Compound
|
 |
 |
|
8" Econocrete
Base
|
Future Barrier
Cable Assembly
|
 |
 |
|
Crushed Aggregate
Pile
|
Batch Plant
|
 |
 |
|
Batch Plant
Loading Trucks
|
Future Taxiway
'E'
|
 |
 |
|
Survey Crews Working |
Trimming Base Elevation |
 |
 |
|
Paving Econocrete
Base
|
Paving Econocrete Base
|
 |
 |
|
Applying Curing
Compound
|
8" Econocrete
Base
|
 |
 |
|
Future Barrier
Cable Assembly
|
Paving Econocrete
Base
|
 |
 |
|
Paving Econocrete
Base
|
Paving Econocrete
Base
|
 |
 |
|
Paving Econocrete
Base
|
Paving Econocrete
Base
|
 |
 |
|
Applying Curing Compound |
Econocrete Base
|
 |
 |
|
Econocrete Base
|
Future Location
of Taxiway E
|
 |
 |
|
Future Location
of Taxiway A-4
|
Future Location
of Taxiway A-4
|