<< Back to Pictures
Filling the Batch Plant
Concrete Batch Plant
In-Pavement Light Can Installation
Paving 17" Concrete
Future BAK-14 System
Dirt Work Along Pavement Edge
Work on North Barrier
6,600 Feet of New Pavement
Batch Plant Loading Concrete
Runway 9/27 Intersection
Touchdown Zone Light Cans
Taxiway A-3 Intersection
Econocrete Paving North of Rwy 9/27
Rwy 18/36 & 13/31 Intersection
New and Old Taxiway A-4
Soon-to-be Taxiway E
Runway 18 Threshold
Runway 36 Threshold
Final Grading to Infield
Runway 36 Papi's
17" PCC & 6" Econocrete
Runway Edge Lighting Installation
Centerline Light Cans
Runway 36 Papi
Nearing End of Phase 1 Paving
End of Phase 1 Paving
Future Taxiway E
Paving Taxiway A4